An MSLD (Maritime Survivor Locating Device) is a simple, two
part, self managed Alert & Locate system used to provide safety cover
for virtually any application on, under or around water. An MSLD system is normally made up of two components.
ALERTING UNIT SOS
transmitter worn on the
person (PLB)

BASE UNIT monitor/receiver/alarm/locator

|
The Sea Marshall alerts are
typically worn with a work vest, as life vest are worn whenever a person
is in danger of falling overboard or being lost at sea. The logic
is to reduce the risk by, providing an automatic water activated alert,
an immediate alarm to the crew and precision direction back to where the
man overboard (MOB) is located.
The operational objective
is a one step process. If a person requires a flotation device, then
the Sea Marshall alert is better to be equipped or integrated into the
work vest or Personal flotation device (PFD).
Survival Platforms
Ability to provide multiple
persons temporary refuge from the water.
Coming Soon!
|
A great deal can be done
to improve the safety of a man overboard retrieval and rescue operation.
One reason for this has been advances in technology, resulting in better
materials. However, a change in attitude can go a lot further in minimizing
the inherent dangers, by training the crew to be a rescue minded crew,
instead of just seamen or workforce thinking. This means that every professional
sailor should look at himself and train himself to be able to render professional
mob rescue assistance.
We offer rescue ladders,
scramble nets, rescue cradles, rescue nets for Fast Rescue Craft (FRC) and in-water rescue
systems and transfer systems designed for all types of vessels including
fast rescue vessels, yachts, commercial vessels and docksides.

|
-
Can your present system automatically
account for personnel on board (personnel on premise)
-
Do you know where your people
are in an emergency evacuation drill? or muster drill?
-
Who reported to the right station?
-
Who reported to the wrong station?
-
Who is still missing?
-
Time it took for each muster station to successfully report?
-
Generate automatically Muster Drill reports?
|